BLOG · IDEAL MACHINERY

Concrete Pump Operating Instructions

In this article

    Different founction of the remote control and control box:

    Preparation before use:

    1. Add diesel into the engine, fill the entire hydralic tank with hydraulic oil, please do not use other oil.

    2. When using for the first time, wet the pipe with water first, lubricate the pipe with diluted concrete.

    How to start the machine:

    Step one: switch on the power and the working panel light up.

    Step two: Turn the cooling switch and open the fan.

    Step three: Turn on the switch of the diesel engine

    Step four: Use the remote control or the switch to start the diesel engine.

    Then the machine will start to work.

    Please clean the pipes after each use, so as not to block the pipes with dry concrete.

    Need help choosing equipment?

    Tell us your application and equipment requirements.